China Caminhões fabricante e designer
Enviar: sales@cl-spv.com
EnglishالعربيةবাংলাFrançaisDeutschItalianoPortuguêsРусскийEspañolاردو
 Editar Tradução

Limpeza de alta pressão

» Cidade Truck Saneamento » Limpeza de alta pressão

Dongfeng Tianlong cleans the sewage suction truck in the first four and after eight in the Euro six

Dongfeng Tianlong cleans the sewage suction truck in the first four and after eight in the Euro six

东风天龙前四后八清洗吸污车图片
Parâmetros técnicos do veículo
Modelo do veículo CL5310GQWZH6 Nome do Produto Cleaning the caminhão de sucção de esgoto
Massa total (kg) 31000 Massa nominal (kg) 11975,11910
Tara (kg) 18895 Velocidade máxima (km / h) 89
dimensões (milímetros) 11990× 2550 × 3980 Número de passageiros 3,2
Ângulo de aproximação / ângulo de partida (°) 17/11 Suspensão dianteira / suspensão traseira (milímetros) 1500/2545

东风天龙前四后八清洗吸污车

Parâmetros técnicos do chassi
Nome do chassi Dongfeng modelo de chassis DFH1310A9
Número de eixos 4 Número de pneus 12
Distância entre eixos (milímetros) 1995+4600+1350 pneus 11.00R20 18PR
Tipo de combustível Óleo diesel Padrões de Emissão Euro Six
motor Comercial dongfeng 350 cavalo-vapor Caixa de velocidade Shaanxi 12th gear
Basic chassis configuration
configuração de chassi It is produced with the original chassis of Dongfeng Company, 1995+4600+1350mm de distância entre eixos: cabine dupla de teto alto, Euro Sixth Dongfeng commercial 350 cv de potência, Shaanxi gear 12-speed 12JSD160TA gearbox, 5eixo duplo frontal T, 10T single-stage reduction double rear axle (Dongfeng 435), the cross-sectional dimension of the longitudinal beam of the frame is 300×90×(8+5)milímetros, the number of leaf springs is 9/9/10, 11.00R20 radial tire, com ABS (Dongfeng 62 fábrica, manual glass sunroof, electric Glass lifter, com ar condicionado, cruise system, gravador de direção, under-protection.
Configuração de upload The tank body is made of high-quality national standard steel plate with a thickness of 8mm. It is a one-piece tank. The effective volume of the tank body is 33 metros cúbicos (freely divided into bins). The auxiliary beam is formed by pressing thick steel. The hydraulically thickened side jack lifts the cylinder, and the back cover is opened and closed hydraulically. , Weichai 420 horsepower auxiliary engine is installed on the front side of the sewage suction tank to connect with 253 water circulation pump; the cleaning part adopts Shuangyao 270 flow high pressure pump, with two sets of 80 meters diameter 25 cleaning pipes, rear cleaning reel (removable ), 150 stealth row, 201 stainless steel water tank is installed on the right rear side, anti-skid walkway is installed in the tank walkway, 2 ladders, and the rest are standard equipment, strictly in accordance with the announcement.

东风天龙前四后八清洗吸污车图片

Palavras-chave:
Limpeza de alta pressão

Formulário de inquérito ( nós entraremos em contato o mais breve possível )

Nome:
*
O email:
*
telefone:
*
Mensageiro:
*
mensagem:

Verificação:
1 + 5 = ?

Talvez você gosta também

  • categorias

  • Bate-papo aberto
    1
    Whatsapp Talk Now!