China Trucks maker and designer
Mail: sales@cl-spv.com
EnglishالعربيةবাংলাFrançaisDeutschItalianoPortuguêsРусскийEspañolاردو

High Pressure Cleaning

» City Sanitation Truck » High Pressure Cleaning

Dongfeng Tianlong cleans the sewage suction truck in the first four and after eight in the Euro six

Dongfeng Tianlong cleans the sewage suction truck in the first four and after eight in the Euro six

东风天龙前四后八清洗吸污车图片
Vehicle technical parameters
Vehicle model CL5310GQWZH6 product name Cleaning the sewage suction truck
Total mass (kg) 31000 Rated mass (kg) 11975,11910
Curb weight (kg) 18895 Maximum speed (km/h) 89
Dimensions (mm) 11990×2550×3980 Number of passengers 3,2
Approach angle/departure angle (°) 17/11 Front suspension/rear suspension (mm) 1500/2545

东风天龙前四后八清洗吸污车

Chassis technical parameters
Chassis name Dongfeng Chassis model DFH1310A9
Number of axes 4 Number of tires 12
Wheelbase (mm) 1995+4600+1350 Tires 11.00R20 18PR
Fuel type Diesel oil Emission Standards Euro Six
engine Dongfeng commercial 350 horsepower Gearbox Shaanxi 12th gear
Basic chassis configuration
Chassis configuration It is produced with the original chassis of Dongfeng Company, 1995+4600+1350mm wheelbase: high-top double-sleeper cab, Euro Sixth Dongfeng commercial 350 horsepower engine, Shaanxi gear 12-speed 12JSD160TA gearbox, 5T double front axle, 10T single-stage reduction double rear axle (Dongfeng 435), the cross-sectional dimension of the longitudinal beam of the frame is 300×90×(8+5)mm, the number of leaf springs is 9/9/10, 11.00R20 radial tire, with ABS (Dongfeng 62 factory, manual glass sunroof, electric Glass lifter, with air conditioning, cruise system, driving recorder, under-protection.
Upload configuration The tank body is made of high-quality national standard steel plate with a thickness of 8mm. It is a one-piece tank. The effective volume of the tank body is 33 cubic meters (freely divided into bins). The auxiliary beam is formed by pressing thick steel. The hydraulically thickened side jack lifts the cylinder, and the back cover is opened and closed hydraulically. , Weichai 420 horsepower auxiliary engine is installed on the front side of the sewage suction tank to connect with 253 water circulation pump; the cleaning part adopts Shuangyao 270 flow high pressure pump, with two sets of 80 meters diameter 25 cleaning pipes, rear cleaning reel (removable ), 150 stealth row, 201 stainless steel water tank is installed on the right rear side, anti-skid walkway is installed in the tank walkway, 2 ladders, and the rest are standard equipment, strictly in accordance with the announcement.

东风天龙前四后八清洗吸污车图片

Keywords:
High Pressure Cleaning

Enquiry Form ( we will get back you as soon as possible )

Name:
*
Email:
*
Phone:
*
Messenger:
*
Message:

Verification:
1 + 5 = ?

Maybe you like also

  • Categories